PROJECTS
CLIENT: San Marcos
LOCATION: North Richmond, NSW
To meet future demands of the Richmond precinct's projected growths, upgrades along the Richmond Wastewater Network and the Richmond Water Resource Recovery Facility which will double the treatment capacity.
The North Richmond Wastewater Treatment Plant will be converted into a new pump station and a new 7-kilometre transfer main will be constructed from the North Richmond plant to the Richmond plant.
Precise Spatial is involved in the new pump station, including the Wet Valve Chamber, Electrical Switch Room diesel generator slots and various other concrete infrastructure buildings.
-
Establishment of Control Network
-
Create Monitoring Reports
-
Create Set-Out, Pre-Pour and As-Built Reports of concrete structures
-
Create QA Reports of Bolts

For any general or business enquiries please get in touch with us.
Provide a brief indication of the tasks you require and we will get back to you as soon as possible.
Please remember to leave your email and contact number
JOIN THE TEAM
Visit the Careers Page, and see all current opportunities.
If there is no listing for an opportunity you are interested in, contact us with your information and resume to be considered for a future position with us.