PROJECTS
CLIENT: LAKEFIELD
LOCATION: Flyers Creek, NSW
Flyers Creek Wind Farm comprises 38 wind turbines, access tracks, local road infrastructure upgrades, electrical connections between the turbines, a 33kv powerline, an on-site substation and a 132kv powerline and switching station connecting the project to Essential Energy's existing Orange North to Cadia powerline
-
Establishment of Control Network
-
Create Set-Out and As-Built Reports of concrete structures
-
Create QA Reports for Pre-Pour and As-Builts for Conformances
-
UAV Capabilities for Verticality Reports

For any general or business enquiries please get in touch with us.
Provide a brief indication of the tasks you require and we will get back to you as soon as possible.
Please remember to leave your email and contact number
JOIN THE TEAM
Visit the Careers Page, and see all current opportunities.
If there is no listing for an opportunity you are interested in, contact us with your information and resume to be considered for a future position with us.