PROJECTS
CLIENT: AWCON
LOCATION: Carrapateena, SA
The underground mine expansion will boost production to 12 million tonnes per annum and average coper production to approximately 110-120ktpa. Gold production is estimated to be ramped up to about 110-120koz.
The improvements in production requires construction of an extensive network of conveyors and belts leading to existing and new crushers and stations
-
Establishment of Control Network
-
Detail Survey of Existing Features
-
Set-Out, Pre-Pour and As-Built Reports of concrete structures
-
Create QA Reports for Bolts

For any general or business enquiries please get in touch with us.
Provide a brief indication of the tasks you require and we will get back to you as soon as possible.
Please remember to leave your email and contact number
JOIN THE TEAM
Visit the Careers Page, and see all current opportunities.
If there is no listing for an opportunity you are interested in, contact us with your information and resume to be considered for a future position with us.